Do you have a question?

In the name of Allah

Number:
Date: 2026/02/12Attachment: None

Technical and engineering service contract

This contract is dated 2026/02/12 between us Mr./Company with national number / national ID to Address postal code mobile number which is called the employer in this contract and Arsh Sazan Bistun company represented by Mr. Seyed Ali Neishabouri at the address of Kerman – Hezaro Ik Shab street, 19th building, fifth building on the right side – postal code 7618657563 – phone 32476899, which on the other hand in this contract is called the consultant for matters related to the technical and engineering office, in accordance with the conditions and specifications below.

Article one – the subject of the contract

Performance of technical engineering and project control office services

Article two _ Contract documents

1-2- The current contract.

2-2- All orders that are communicated by the employer during execution.

>

3-2- All the things that are done and signed by the parties during the execution of the contract.

Article 3 – Term of the contract

< p>The total contract period…calculate…months from the date ………….A…………. until the end of the year…. It is the current year (the year mentioned in A).

employer

Consultant of Arsh Sazan Biston

In the name of Allah

Number:
Date: 2026/02/12Attachment: None

Article four _ contract amount

1-4- is Performing all services as described in the table below on a monthly basis
is
Service description(Required)

the employer

Consultant of Arsh Sazan Biston

In the name of Allah

Number:
Date: 2026/02/12Attachment: None

Note one- The amount of the contract until the end of the year is ……… and in the following year, if the employer wishes to continue cooperation and request a better rate, it will be announced according to the new rate. .

Comment two– The above amount is for two ongoing contracts.

4-2- Completion of general affairs and the bill of losses, the amount in the form of The table is below.

< td width="45">

3

Row

Description Services

Amount

1

Preparation and adjustment of the loss and damage bill

30 percent (thirty percent) of the amount Bill of damages

2

Drawing Ezbilt maps

Each square meter of the building is 600,000 rials

Measurement and estimate of items required for the project

4

Preparation of documents and filing claims and claims of contracting (Klim)
If The claim should be initiated by the employer

20 percent (twenty percent) of the amount of the claim plan

(Klim)

5

Preparation of documents and claims for contracting (Kelim)
If the claim is not initiated by the employer

50% (fifty percent) of the claim amount

(Klim)

p>

6

Analysis and price proposal based on the latest Circulars issued by the
program organization in case the employer does not win

based on the bid price of 0.2% (two tenths of percent) of the bid amount

7

Analysis and price proposal based on the latest circulars Notified by the
program organization in case the employer wins

based on the proposed price of 1% of the proposed amount

employer

Consultant of Arsh Sazan Biston

In the name of Allah

Number:
Date: 2026/02/12Attachment: None

Third comment-If the employer needs the full meter of the project, 1% of the proposed amount will be added to the items of rows 6 and 7.

Article five – How to pay

5-1- Payment of the monthly amount of the contract by the respected employer must be done at the beginning of each month.

Article Six – Obligations of the consultant< /p>

1-6-All information should be provided to the employer by the consultant in both original and PDF format.

6-2-All services should be delivered to the employer on time. .

Article seven – Obligations of the employer

1-7- All matters related to the contract are done in the consultant’s office and if the employer wishes to attend In the meetings and defense of the above cases, its cost is calculated separately. (Travel and accommodation expenses are also the responsibility of the employer.) The employer will be presented at the appointed times. Article eight – This contract is in Article 8 and Article 3. Note and… 4.. page and prepared and arranged in two copies, each copy of which has a single ruling and is valid.

employer

Consultant of Arsh Sazan Biston

Service request

To receive services, complete the service request form or call 09905096620 .

"*" indicates required fields

Get advice

To receive advice, complete the consultation request form or contact 09905096620.

"*" indicates required fields